D 0127_D 0126_11092015_Manual.mp4
2 ft. - General Observation - MISSING TILES 20% START 9:00 TO 3:00
19 ft. - General Observation - MISSING TILES 60% START
21.4 ft. - Surface Reinforcement Corroded, at 12 o'clock, within 8 inches of joint: YES, Start - LONG
21.4 ft. - Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - CIRCUM REBAR
77.3 ft. - General Observation - MISSING TILES 100% START
81.4 ft. - Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: NO - LONG CIRCUM
189.8 ft. - Surface Reinforcement Visible, at 02 o'clock, within 8 inches of joint: YES - LONG
192.4 ft. - General Photograph
192.4 ft. - Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - CORRODED BEYOUND REBAR
196.2 ft. - Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: YES - BEYOUBD REBAR
207.2 ft. - Surface Aggregate Projecting, from 12 to 03 o'clock, within 8 inches of joint: YES - CIRCUM
211.8 ft. - Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: YES
216 ft. - Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: YES - CORRODED BEYIUND REBAR - MISSING REBAR
220.8 ft. - Surface Reinforcement Corroded, from 09 to 03 o'clock, within 8 inches of joint: YES
223.1 ft. - Surface Reinforcement Corroded, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - BEYIOUND REBAR
245.1 ft. - Surface Aggregate Projecting, from 12 to 03 o'clock, within 8 inches of joint: NO
277.7 ft. - Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: YES - BEYOUND REBAR
343.4 ft. - Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: YES - BEYOUND REBAR
356 ft. - Surface Aggregate Projecting, from 12 to 03 o'clock, within 8 inches of joint: YES
| Distance | Code | Observation |
|---|---|---|
| 21.4 | SRC | LONG |
| 81.4 | SRC | LONG CIRCUM |
| 404.3 | MGO | MISSING TILES 100% FINISH |
| 207.2 | SAP | CIRCUM |
| 168.5 | MGO | MISSING TILES 10% |
| 277.7 | SRC | BEYOUND REBAR |
| 2 | MGO | MISSING TILES 20% START 9:00 TO 3:00 |
| 404.3 | SRC | — |
| 19 | MGO | MISSING TILES 60% START |
| 0 | MWL | — |
| 404.3 | SRC | — |
| 211.8 | SAP | — |
| 189.8 | SRV | LONG |
| 107.6 | TF | ACTIVE |
| 245.1 | SAP | — |
| 0 | MWM | — |
| 404.3 | SRC | — |
| 2 | SAM | AREAS OF MISSING TILES |
| 21.4 | SRC | CIRCUM REBAR |
| 138.9 | MGO | MISSING TILES 50% |
| 192.4 | MGP | — |
| 0 | AMH | 2:10AM |
| 192.4 | SRC | CORRODED BEYOUND REBAR |
| 259.6 | TF | ACTIVE |
| 404.5 | AMH | 2:50AM |
| 220.8 | SRC | — |
| 77.3 | MGO | MISSING TILES 100% START |
| 216 | SRC | CORRODED BEYIUND REBAR - MISSING REBAR |
| 404.3 | SRC | — |
| 223.1 | SRC | BEYIOUND REBAR |
| 196.2 | SRC | BEYOUBD REBAR |
| 404.3 | SAM | — |
| 356 | SAP | — |
| 324.5 | MGO | MISSING TILES 20% |
| 343.4 | SRC | BEYOUND REBAR |