2 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - LONG
2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - MISSING REBAR
2 ft. - Surface Reinforcement Corroded, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - LONG & CIRCUM
2 ft. - General Observation - MISSING TILES 100% START 8:00 TO 4:00
2 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - CIRCUM
14.8 ft. - Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: YES - CORRODED BEYOUND REBAR
14.8 ft. - General Photograph - CORRODED BEYOUND REBAR
25.5 ft. - Surface Reinforcement Corroded, from 10 to 04 o'clock, within 8 inches of joint: NO - BEYOUND REBAR
72.5 ft. - Surface Reinforcement Corroded, from 10 to 04 o'clock, within 8 inches of joint: YES - BEYOUND REBAR
86.5 ft. - Surface Reinforcement Projecting, from 09 to 04 o'clock, within 8 inches of joint: YES
123.3 ft. - General Observation - MISSING TILES 80%
166.8 ft. - Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: YES - BEYOUND REBAR
278.5 ft. - Surface Reinforcement Corroded, from 10 to 03 o'clock, within 8 inches of joint: YES - MISSING & PROJECTING
351 ft. - General Observation - MISSING TILES 50% START
400.5 ft. - General Observation - MISSING TILES 100% START
461.2 ft. - Surface Reinforcement Projecting, from 10 to 12 o'clock, within 8 inches of joint: NO
494.8 ft. - General Observation - 20% MISSING TILES
564.3 ft. - Surface Reinforcement Corroded, from 09 to 04 o'clock, within 8 inches of joint: YES - PROJECTING MISSING BEYOUND REAR CORRODED
570.6 ft. - General Photograph
574.3 ft. - General Photograph
583.3 ft. - General Photograph
652.6 ft. - Surface Reinforcement Corroded, from 09 to 04 o'clock, within 8 inches of joint: YES - CORRODED BEYOUND REBAR
702.6 ft. - Surface Reinforcement Corroded, from 08 to 04 o'clock, within 8 inches of joint: YES - MISSING PROJECTING CORRODED BEYOUND REBAR
| Distance | Code | Observation |
|---|---|---|
| 25.5 | SRC | BEYOUND REBAR |
| 583.3 | MGP | — |
| 722.5 | SAP | — |
| 166.8 | SRC | BEYOUND REBAR |
| 2 | SAM | SEVERE |
| 123.3 | MGO | MISSING TILES 80% |
| 2 | MGO | MAG COAT 60% START 8:00 TO 4:00 |
| 2 | SRV | LONG |
| 722.5 | SRV | — |
| 2 | SAP | MISSING REBAR |
| 652.6 | SRC | CORRODED BEYOUND REBAR |
| 574.3 | MGP | — |
| 2 | SRC | LONG & CIRCUM |
| 2 | SRC | CORRODED BEYOUND REBAR |
| 564.3 | SRC | PROJECTING MISSING BEYOUND REAR CORRODED |
| 72.5 | SRC | BEYOUND REBAR |
| 0 | AMH | 1:05AM |
| 86.5 | SRP | — |
| 2 | MGO | MISSING TILES 100% START 8:00 TO 4:00 |
| 14.8 | SRC | CORRODED BEYOUND REBAR |
| 722.6 | SRC | CORRODED BEYOUND REBAR |
| 400.5 | MGO | MISSING TILES 100% START |
| 2 | SRV | CIRCUM |
| 722.9 | AMH | 2:15AM |
| 0 | MWL | — |
| 722.5 | SRC | MISSING CORRODED BEYOUND REBAR |
| 351 | MGO | MISSING TILES 50% START |
| 494.8 | MGO | 20% MISSING TILES |
| 0 | MWM | — |
| 278.5 | SRC | MISSING & PROJECTING |
| 722.7 | MGO | MH CONN ACTIVE 9:00 |
| 722.4 | SRV | — |
| 14.8 | MGP | CORRODED BEYOUND REBAR |
| 722.5 | SAM | — |
| 702.6 | SRC | MISSING PROJECTING CORRODED BEYOUND REBAR |
| 570.6 | MGP | — |
| 461.2 | SRP | — |