Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 23, 2018, 09:37 PM
  • Section#04_02_1796_02_1795_4232018.mpg

Date
04/23/2018
W/O
N/A
Weather
Dry
Operator/Surveyor
OSCAR V.
Sewer ID
Z00292
PipeID
P04141
Time
2:37 PM
Certificate
N/A
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
Y0696
Sewer Name
02 MONTEREY PARK RELIEF TRUNK
City
MONTEREY PARK
Loc. details
Other
Location Code
Z
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
12
Purpose
Post-Rehabilitation Survey
Project
20181231SHO_MONTEREY_PARK_RELIEF_TRUNK
Material
NRCP
Shape
Circular
Height
15 in.
Upstream MH
02 1796
Downstream MH
02 1795
Dir. of Survey
Downstream
Length Surveyed
280.7 ft.
Total Length
280.7 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
0
Overall Quick
Overall Rating
0
Pipe schematic from manhole 02 1796 to 02 1795
MH: 02 1796MH: 02 1795downstream0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - POST REHAB BEINGS @ MH 17966.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"36.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4"45.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4"60.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4"81.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4"119.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4"122.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4"164.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4"167.3 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4"205.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4"211.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4"229.4 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4"241.3 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4"280.7 ft. AMH - Downstream Manhole, Survey Ends - POST REHAB ENDS @ MH 1795

Observations (16)

DistanceCodeObservation
241.3TF
119.8TF
81.2TF
0MWL
229.4TF
45.6TF
205.9TF
0AMHPOST REHAB BEINGS @ MH 1796
60.5TF
167.3TF
211.7TF
122.8TF
164.4TF
36.7TF
6.8TF
280.7AMHPOST REHAB ENDS @ MH 1795

Properties (5)