Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 18, 2018, 02:04 PM
  • Section#09_02_1801_02_1800_4182018.mpg

Date
04/18/2018
W/O
N/A
Weather
Dry
Operator/Surveyor
OSCAR V.
Sewer ID
Z00292
PipeID
P04146
Time
7:04 AM
Certificate
N/A
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
Y0696
Sewer Name
02 MONTEREY PARK RELIEF TRUNK
City
MONTEREY PARK
Loc. details
Other
Location Code
Z
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
12
Purpose
Post-Rehabilitation Survey
Project
20181231SHO_MONTEREY_PARK_RELIEF_TRUNK
Material
NRCP
Shape
Circular
Height
15 in.
Upstream MH
02 1801
Downstream MH
02 1800
Dir. of Survey
Downstream
Length Surveyed
280.3 ft.
Total Length
280.3 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
0
Overall Quick
Overall Rating
0
Pipe schematic from manhole 02 1801 to 02 1800
MH: 02 1801MH: 02 1800downstream0 ft. AMH - Upstream Manhole, Survey Begins - POST REHAB BEINGS @ MH 18010 ft. MWL - Water Level, 5 %of cross sectional area54.3 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4"58.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4"92 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4"107.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4"130.4 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4"142.6 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: NO, 4"151.3 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4"190 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4"192.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4"231.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4"240.3 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4"251.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4"270.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4"272.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4"280.3 ft. AMH - Downstream Manhole, Survey Ends - POST REHAB ENDS @ MH 1800

Observations (17)

DistanceCodeObservation
0AMHPOST REHAB BEINGS @ MH 1801
240.3TF
54.3TF
280.3AMHPOST REHAB ENDS @ MH 1800
272.7TF
142.6TF
190TF
270.7TF
251.1TF
58.1TF
231.9TF
92TF
151.3TF
107.1TF
130.4TF
0MWL
192.9TF

Properties (5)

additional_info
POST REHAB INSPECTION ONLY
custom_field_three
POST REHAB INSPECTION ONLY
custom_field_two
5
customer
LACSD
datetime
2018-04-18T07:04:43-07:00