Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 20, 2018, 07:19 PM
  • Section#05_02_1797_02_1796_4202018.mpg

Date
04/20/2018
W/O
N/A
Weather
Dry
Operator/Surveyor
OSCAR V.
Sewer ID
Z00292
PipeID
P04142
Time
12:19 PM
Certificate
N/A
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
Y0696
Sewer Name
02 MONTEREY PARK RELIEF TRUNK
City
MONTEREY PARK
Loc. details
Other
Location Code
Z
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
12
Purpose
Post-Rehabilitation Survey
Project
20181231SHO_MONTEREY_PARK_RELIEF_TRUNK
Material
NRCP
Shape
Circular
Height
15 in.
Upstream MH
02 1797
Downstream MH
02 1796
Dir. of Survey
Downstream
Length Surveyed
282.9 ft.
Total Length
282.9 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
0
Overall Quick
Overall Rating
0
Pipe schematic from manhole 02 1797 to 02 1796
MH: 02 1797MH: 02 1796downstream0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - POST REHAB BEGINS @ MH 17976.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 8"11.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 8"42.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 8"55.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 8"85 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 8"96.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 8"117.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"143.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 8"161 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 8"184.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 8"189.4 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 8"229.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 8"245.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4"258.4 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: NO, 4"274.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4"282.9 ft. AMH - Downstream Manhole, Survey Ends - POST REHAB ENDS @ MH 1796

Observations (18)

DistanceCodeObservation
184.7TF
274.9TF
85TF
55.6TF
229.4TF
6.1TF
0MWL
258.4TF
143.6TF
96.7TF
161TF
282.9AMHPOST REHAB ENDS @ MH 1796
117.1TF
42.7TF
0AMHPOST REHAB BEGINS @ MH 1797
11.1TF
189.4TF
245.8TF

Properties (5)

additional_info
POST REHAB INSPECTION ONLY
custom_field_three
POST REHAB INSPECTION ONLY
custom_field_two
5
customer
LACSD
datetime
2018-04-20T12:19:01-07:00