Search
Uploads
Inspections
Wastewater/Activity/PacpInspection/1.0
Sep 29, 2022, 09:40 AM
B 1275_B 1274_9292022_030829.mp4
Date
09/29/2022
W/O
0978495
Weather
Dry
Operator/Surveyor
BRAR
Sewer ID
Z01126
PipeID
P25170
Time
2:40 AM
Certificate
SEE REMARKS
System Owner
LACSD
Date Cleaned
—
Pre-Cleaning
Not Known
Media Label
H 3214
Sewer Name
B JOINT OUTFALL B - UNIT 6J
City
PASADENA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
12
Purpose
Maintenance Related
Project
20220929SB_JOB_UN_6J
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Upstream MH
B 1275
Downstream MH
B 1274
Dir. of Survey
Downstream
Length Surveyed
271.5 ft.
Total Length
271.5 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
3212
O&M Rating
8
Overall Index
2
Overall Quick
—
Overall Rating
8
Pipe schematic from manhole B 1275 to B 1274
MH: B 1275
MH: B 1274
downstream
0 ft. MWM - Water Mark, 20 %of cross sectional area
0 ft. AMH - Upstream Manhole, Survey Begins - B.1275
0 ft. MWL - Water Level, 15 %of cross sectional area
257 ft. RFJ - Roots Fine Joint, from 02 to 04 o'clock, within 8 inches of joint: YESR
260.8 ft. RFJ - Roots Fine Joint, from 02 to 04 o'clock, within 8 inches of joint: YESR
264.9 ft. RMJ - Roots Medium Joint, from 08 to 10 o'clock, 5 %, within 8 inches of joint: YESR
269.3 ft. RMJ - Roots Medium Joint, from 08 to 10 o'clock, 5 %, within 8 inches of joint: YESR
271.5 ft. AMH - Downstream Manhole, Survey Ends - B.1274
All inspections of P25170
Work order 0978495
Observations (8)
Distance
Code
Observation
257
RFJ
—
264.9
RMJ
—
0
MWM
—
269.3
RMJ
—
0
AMH
B.1275
271.5
AMH
B.1274
260.8
RFJ
—
0
MWL
—
Properties (7)
additional_info
U-0618-0703002249
custom_field_three
POST ROOT EVALUATION
custom_field_two
5
customer
LACSD
datetime
2022-09-29T02:40:50-07:00
documentation
BRAR, OBREGON, CASTILLO, OLIVER
is_lateral_inspection
false