Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 10, 2022, 06:24 PM
  • 29 0307_29 0302_08102022_114619.mp4

Date
08/10/2022
W/O
967346
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z01025
PipeID
P24321
Time
11:24 AM
Certificate
U-715-07000770
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K10357
Sewer Name
29 28TH STREET SEWER
City
SIGNAL HILL
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
02
Purpose
Routine Assessment
Project
RFIR_WO_967346_TV29056_AUG2022
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
29 0302
Downstream MH
29 0307
Dir. of Survey
Upstream
Length Surveyed
326.1 ft.
Total Length
326.1 ft.
Structural Index
3
Structural Quick
3L2L
Structural Rating
320
O&M Index
2
O&M Quick
2L00
O&M Rating
128
Overall Index
2
Overall Quick
Overall Rating
448
Pipe schematic from manhole 29 0302 to 29 0307
MH: 29 0302MH: 29 0307upstream0 ft. AMH - Upstream Manhole, Survey Ends - 29 03070.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish2.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish2.1 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish159.5 ft. TF - Tap Factory Made, at 09 o'clock, -, within 8 inches of joint: NO, 4" - OPEN275.5 ft. TFA - Tap Factory Made Active, at 09 o'clock, -, within 8 inches of joint: NO, 4"307.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish307.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start321.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start324.1 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start324.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start326.1 ft. MWM - Water Mark, 10 %of cross sectional area326.1 ft. MWL - Water Level, 5 %of cross sectional area326.1 ft. AMH - Downstream Manhole, Survey Begins - 29 0302

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    4.4 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Finish

    18.6 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish

Observations (14)

DistanceCodeObservation
324SSS
326.1AMH29 0307
166.6TFOPEN
50.6TFA
0MWM
324CM
325.8DAGS
2CM
2SSS
4.4DAGS
0MWL
18.6DAGS
18.6DAGS
0AMH29 0302

Properties (7)

additional_info
630098081022062
custom_field_three
NO STRUCTURAL DEFECTS
custom_field_two
3
customer
1
datetime
2022-08-10T11:24:29-07:00
documentation
PROPIPE
is_lateral_inspection
false