Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 15, 2022, 08:35 PM
  • 29 0203A_29 0203_08152022_134613.mp4

Date
08/15/2022
W/O
967346
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z01025
PipeID
P24103
Time
1:35 PM
Certificate
U-715-07000770
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K10364
Sewer Name
29 28TH STREET SEWER
City
SIGNAL HILL
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
01
Purpose
Routine Assessment
Project
RFIR_WO_967346_TV29056_AUG2022
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
29 0203
Downstream MH
29 0203A
Dir. of Survey
Upstream
Length Surveyed
100.1 ft.
Total Length
100.1 ft.
Structural Index
2
Structural Quick
322C
Structural Rating
48
O&M Index
2
O&M Quick
2C00
O&M Rating
38
Overall Index
2
Overall Quick
Overall Rating
86
Pipe schematic from manhole 29 0203 to 29 0203A
MH: 29 0203MH: 29 0203Aupstream0 ft. AMH - Upstream Manhole, Survey Ends - 29 0203A2.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish2.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish15.9 ft. CM - Crack Multiple, from 09 to 12 o'clock, within 8 inches of joint: YES27.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"30.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"61.7 ft. MWLS - Water Level, Sag in pipe, 15 %of cross sectional area, Finish64.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4" - OPEN67.1 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 4", 4"69.5 ft. MWLS - Water Level, Sag in pipe, 15 %of cross sectional area, Start77.2 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: NO, 4"79.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"93.6 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES98.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start98.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start100.1 ft. AMH - Downstream Manhole, Survey Begins - 29 0203A100.1 ft. MWM - Water Mark, 10 %of cross sectional area100.1 ft. MWL - Water Level, 5 %of cross sectional area

Observation photos (3)

  • Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

    6.5 ft. - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

  • Water Level, Sag in pipe, 15 %of cross sectional area, Start

    30.6 ft. - Water Level, Sag in pipe, 15 %of cross sectional area, Start

  • Crack Multiple, from 09 to 12 o'clock, within 8 inches of joint: YES

    84.2 ft. - Crack Multiple, from 09 to 12 o'clock, within 8 inches of joint: YES

Observations (18)

DistanceCodeObservation
2DAGS
6.5CM
22.9TFC
0AMH29 0203A
20.4TFC
0MWM
33TFA
35.7TFOPEN
72.9TFC
98DAGS
0MWL
84.2CM
30.6MWLS
70TFC
2SSS
38.4MWLS
98SSS
100.1AMH29 0203A

Properties (7)

additional_info
630098081522062
custom_field_three
CRACKS, SAG IN PIPE
custom_field_two
3
customer
1
datetime
2022-08-15T13:35:25-07:00
documentation
PROPIPE
is_lateral_inspection
false