Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 24, 2022, 07:06 AM
  • 22 0971_22 0970_08242022_002454.mp4

Date
08/24/2022
W/O
966849
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00790
PipeID
P17341
Time
12:06 AM
Certificate
U-715-07000770
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K10369
Sewer Name
22 BASE LINE TRUNK
City
GLENDORA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
12
Purpose
Routine Assessment
Project
RFIR_WO_966849_TV22002_AUG2022
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0971
Downstream MH
22 0970
Dir. of Survey
Downstream
Length Surveyed
339.1 ft.
Total Length
339.1 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
5
Pipe schematic from manhole 22 0971 to 22 0970
MH: 22 0971MH: 22 0970downstream0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - 22 09710 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 30 %of cross sectional area2.7 ft. MGO - General Observation - MAG COATING2.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start4.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start43.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4"87.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4"136.3 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4"185.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4"237.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4"286.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4"330.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4"337.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish337.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish339.1 ft. AMH - Downstream Manhole, Survey Ends - 22 0970

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.7 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    4.8 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (17)

DistanceCodeObservation
0MGOCONNECTION AT MH 9 O'CLOCK
87.9TF
2.7MGOMAG COATING
339.1AMH22 0970
4.8SSS
0AMH22 0971
337.3SAP
337.3SSS
136.3TF
43.2TF
0MWL
0MWM
237.6TF
286.4TF
2.7SAP
330.9TF
185.4TF

Properties (6)

custom_field_three
SPALLING, AGGREGATE PROJECTING
custom_field_two
3
customer
1
datetime
2022-08-24T00:06:47-07:00
documentation
PROPIPE
is_lateral_inspection
false