Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 24, 2022, 09:55 AM
  • 22 0966_22 0965_08242022_031414.mp4

Date
08/24/2022
W/O
966849
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00790
PipeID
P17336
Time
2:55 AM
Certificate
U-715-07000770
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K10369
Sewer Name
22 BASE LINE TRUNK
City
GLENDORA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
12
Purpose
Routine Assessment
Project
RFIR_WO_966849_TV22002_AUG2022
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0966
Downstream MH
22 0965
Dir. of Survey
Downstream
Length Surveyed
395.4 ft.
Total Length
395.4 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
5
Pipe schematic from manhole 22 0966 to 22 0965
MH: 22 0966MH: 22 0965downstream0 ft. AMH - Upstream Manhole, Survey Begins - 22 09660 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area2.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start6.1 ft. MGO - General Observation - MAG COATING24 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4"65.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4"72.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4"120.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4"124.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4"164.6 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: NO, 4"217.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4"225.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4"269.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4"273.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4"318.5 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: NO, 4"322.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4"338.6 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start393.4 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish393.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish395.4 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK395.4 ft. AMH - Downstream Manhole, Survey Ends - 22 0965

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.5 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    338.6 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (22)

DistanceCodeObservation
217.2TF
318.5TF
273.9TF
164.6TF
65.2TF
393.4SSS
338.6SSS
124.5TF
395.4MGOCONNECTION AT MH 9 O'CLOCK
393.4SAP
120.8TF
322.6TF
24TF
0AMH22 0966
2.5SAP
6.1MGOMAG COATING
0MWL
0MWM
269.7TF
225.1TF
72.6TF
395.4AMH22 0965

Properties (6)

custom_field_three
AGGREGATE PROJECTING, SPALLING
custom_field_two
3
customer
1
datetime
2022-08-24T02:55:44-07:00
documentation
PROPIPE
is_lateral_inspection
false