Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 24, 2022, 10:15 AM
  • 22 0965_22 0964_08242022_031939.mp4

Date
08/24/2022
W/O
966849
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00790
PipeID
P17335
Time
3:15 AM
Certificate
U-715-07000770
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K10369
Sewer Name
22 BASE LINE TRUNK
City
GLENDORA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
12
Purpose
Routine Assessment
Project
RFIR_WO_966849_TV22002_AUG2022
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0965
Downstream MH
22 0964
Dir. of Survey
Downstream
Length Surveyed
74.1 ft.
Total Length
74.1 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
3
Pipe schematic from manhole 22 0965 to 22 0964
MH: 22 0965MH: 22 0964downstream0 ft. AMH - Upstream Manhole, Survey Begins - 22 09650 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK1.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start1.6 ft. MGO - General Observation - MAG COATING71.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish74 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK74.1 ft. AMH - Downstream Manhole, Survey Ends - 22 0964

Observation photos (1)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    1.6 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (9)

DistanceCodeObservation
74.1AMH22 0964
1.6SAP
0AMH22 0965
1.6MGOMAG COATING
0MWL
71.8SAP
0MWM
74MGOCONNECTION AT MH 9 O'CLOCK
0MGOCONNECTION AT MH 9 O'CLOCK

Properties (6)

custom_field_three
AGGREGATE PROJECTING
custom_field_two
3
customer
1
datetime
2022-08-24T03:15:01-07:00
documentation
PROPIPE
is_lateral_inspection