Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 12, 2022, 07:45 PM
  • B 0582_B 0581_09122022_124902.mp4

Date
09/12/2022
W/O
967097
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00104
PipeID
P09462
Time
12:45 PM
Certificate
U-715-07000770
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K10371
Sewer Name
B JOINT OUTFALL B - UNIT 8A
City
EL MONTE
Loc. details
Parking Lot
Location Code
G
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
22
Purpose
Routine Assessment
Project
RFIR_WO_967097_TV15149_AUG2022
Sewer Type
Siphon
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Width
30 in.
Upstream MH
B 0581
Downstream MH
B 0582
Dir. of Survey
Upstream
Length Surveyed
2.1 ft.
Total Length
2.1 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
3
Pipe schematic from manhole B 0581 to B 0582
MH: B 0581MH: B 0582upstream0 ft. MSA - Survey Abandoned - VIEW OF SIPHON UPLEG0 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: NO2.1 ft. MWL - Water Level, 30 %of cross sectional area2.1 ft. MGO - General Observation - CONNECTION AT THE MH 9 OC'LOCK2.1 ft. AMH - Downstream Manhole, Survey Begins - B 05812.1 ft. MWM - Water Mark, 35 %of cross sectional area2.1 ft. MGO - General Observation - SOUTH BARREL

Observation photos (1)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: NO

    2.1 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: NO

Observations (7)

DistanceCodeObservation
0MWL
2.1MSAVIEW OF SIPHON UPLEG
2.1SAP
0MGOCONNECTION AT THE MH 9 OC'LOCK
0AMHB 0581
0MWM
0MGOSOUTH BARREL

Properties (7)

additional_info
630098091222052
custom_field_three
AGGREGATE PROJECTING
custom_field_two
3
customer
1
datetime
2022-09-12T12:45:58-07:00
documentation
PROPIPE
is_lateral_inspection
false