Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 2, 2022, 08:58 AM
  • 29 0418_29 0417_09022022_021312.mp4

Date
09/02/2022
W/O
972915
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00355
PipeID
P24455
Time
1:58 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10411
Sewer Name
29 LEWIS AVENUE TRUNK
City
SIGNAL HILL
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
03
Purpose
Routine Assessment
Project
RFIR_WO_972915_TV29122_SEP2022
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
29 0418
Downstream MH
29 0417
Dir. of Survey
Downstream
Length Surveyed
270.2 ft.
Total Length
270.2 ft.
Structural Index
4
Structural Quick
4131
Structural Rating
7
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
4
Overall Quick
Overall Rating
7
Pipe schematic from manhole 29 0418 to 29 0417
MH: 29 0418MH: 29 0417downstream0 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - 29 04180 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK3.8 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start89.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"94.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"134 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6"148 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"178.1 ft. FM - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES203.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"212.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"257.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"259 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"266.2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish270.2 ft. AMH - Downstream Manhole, Survey Ends - 29 0417

Observation photos (3)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.8 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6"

    134 ft. - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6"

  • Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

    178.1 ft. - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

Observations (17)

DistanceCodeObservation
259TF
266.2CM
134TB
212.7TF
0MWM
94.1TF
0MWL
0MGOCONNECTION AT MH 3 O'CLOCK
178.1FM
257.1TF
89.8TFC
270.2AMH29 0417
203.2TF
3.8CM
0AMH29 0418
148TFC
0MGOCONNECTION AT MH 9 O'CLOCK

Properties (7)

additional_info
630074090122202
custom_field_three
MULTIPLE CRACKS
custom_field_two
3
customer
1
datetime
2022-09-02T01:58:38-07:00
documentation
PROPIPE
is_lateral_inspection
false