Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 15, 2022, 09:14 AM
  • 16 0197_16 0196_09152022_022004.mp4

Date
09/15/2022
W/O
972487
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00647
PipeID
P13242
Time
2:14 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10422
Sewer Name
16 ARROYO SECO TRUNK, SECTION 4
City
S.PASADENA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
17
Purpose
Routine Assessment
Project
WO_972487_TV16012_SEP2022
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
21 in.
Width
21 in.
Upstream MH
16 0197
Downstream MH
16 0196
Dir. of Survey
Downstream
Length Surveyed
182 ft.
Total Length
182 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
3
Pipe schematic from manhole 16 0197 to 16 0196
MH: 16 0197MH: 16 0196downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 16 01975 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start104.5 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"165.9 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"180.3 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish182 ft. AMH - Downstream Manhole, Survey Ends - 16 0196

Observation photos (1)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    5 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (8)

DistanceCodeObservation
182AMH16 0196
0MWL
104.5TFA
165.9TF
0MWM
5SAV
0AMH16 0197
180.3SAV

Properties (7)

additional_info
630074091422202
custom_field_three
NO SEVERE DEFECTS
custom_field_two
4
customer
1
datetime
2022-09-15T02:14:21-07:00
documentation
PROPIPE
is_lateral_inspection
false