Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 26, 2022, 08:51 AM
  • 05 1393_05 1392_08262022_020658.mp4

Date
08/26/2022
W/O
967399
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00487
PipeID
P06614
Time
1:51 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10298
Sewer Name
05 MONETA TRUNK
City
GARDENA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
21
Purpose
Routine Assessment
Project
RFIR_WO_967399_TV05336_AUG2022
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
10 in.
Width
18 in.
Upstream MH
05 1393
Downstream MH
05 1392
Dir. of Survey
Downstream
Length Surveyed
270.7 ft.
Total Length
270.7 ft.
Structural Index
4
Structural Quick
4J00
Structural Rating
212
O&M Index
2
O&M Quick
312I
O&M Rating
107
Overall Index
3
Overall Quick
Overall Rating
319
Pipe schematic from manhole 05 1393 to 05 1392
MH: 05 1393MH: 05 1392downstream0 ft. AMH - Upstream Manhole, Survey Begins - 05 13930 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area4.4 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start34.3 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"77.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"132 ft. DAGS - Deposits Attached Grease, 15 %of cross sectional area, from 08 to 05 o'clock, , within 8 inches of joint: YES134.8 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"183.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"232.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"266 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish269.7 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish270.7 ft. MGO - General Observation - CONNECTION AT MH 9'OCLOCK CAPPED270.7 ft. AMH - Downstream Manhole, Survey Ends - 05 1392270.7 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK

Observation photos (2)

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    4.4 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 15 %of cross sectional area, from 08 to 05 o'clock,  , within 8 inches of joint: YES

    132 ft. - Deposits Attached Grease, 15 %of cross sectional area, from 08 to 05 o'clock, , within 8 inches of joint: YES

Observations (16)

DistanceCodeObservation
5DAGS
132DAGS
270.7MGOCONNECTION AT MH 9'OCLOCK CAPPED
77.1TFC
0AMH05 1393
34.3TF
270.7AMH05 1392
134.8TFA
0MWL
0MWM
232.4TFC
183.5TFC
266DAGS
270.7MGOCONNECTION AT MH 3 O'CLOCK
4.4FM
269.7FM

Properties (7)

additional_info
63074082522202
custom_field_three
MULTIPLE FRACTURE'S
custom_field_two
2
customer
1
datetime
2022-08-26T01:51:50-07:00
documentation
PROPIPE
is_lateral_inspection
false