Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 27, 2022, 07:05 AM
  • 18 0759_18 0758_05272022_002630.mp4

Date
05/27/2022
W/O
951939
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00706
PipeID
P14616
Time
12:05 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10130
Sewer Name
18 SO WHITTIER OUTFALL TR, SECTS 1,2,3,&4
City
WHITTIER
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
26
Purpose
Routine Assessment
Project
WO_951939_TV18053_MAY2022
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Width
27 in.
Upstream MH
18 0759
Downstream MH
18 0758
Dir. of Survey
Downstream
Length Surveyed
507.9 ft.
Total Length
507.9 ft.
Structural Index
2
Structural Quick
322S
Structural Rating
206
O&M Index
2
O&M Quick
2200
O&M Rating
4
Overall Index
2
Overall Quick
Overall Rating
210
Pipe schematic from manhole 18 0759 to 18 0758
MH: 18 0759MH: 18 0758downstream0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 18 07592 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. MGO - General Observation - MAG COATING504 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish504.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish504.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish507.9 ft. MGO - General Observation - COCKROACHES IN MANHOLE507.9 ft. AMH - Downstream Manhole, Survey Ends - 18 0758

Observation photos (4)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - MAG COATING

    2 ft. - General Observation - MAG COATING

  • General Observation - COCKROACHES IN MANHOLE

    507.9 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (13)

DistanceCodeObservation
0MWL
507.9MGOCOCKROACHES IN MANHOLE
0MGOCONNECTION AT MH 3 O'CLOCK
2SSS
507.9AMH18 0758
2SAP
0MWM
504.9SAP
504.9DAGS
2DAGS
504SSS
0AMH18 0759
2MGOMAG COATING

Properties (7)

additional_info
630098052622201
custom_field_three
VISIBLE/PROJECTING AGGREGATE
custom_field_two
3
customer
1
datetime
2022-05-27T00:05:14-07:00
documentation
PRO PIPE
is_lateral_inspection
false