Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 27, 2022, 07:28 AM
  • 18 0758_18 0757_05272022_005217.mp4

Date
05/27/2022
W/O
951939
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00706
PipeID
P14615
Time
12:28 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10130
Sewer Name
18 SO WHITTIER OUTFALL TR, SECTS 1,2,3,&4
City
WHITTIER
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
26
Purpose
Routine Assessment
Project
WO_951939_TV18053_MAY2022
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Width
27 in.
Upstream MH
18 0758
Downstream MH
18 0757
Dir. of Survey
Downstream
Length Surveyed
489.4 ft.
Total Length
489.4 ft.
Structural Index
3
Structural Quick
3R2R
Structural Rating
482
O&M Index
2
O&M Quick
2R00
O&M Rating
194
Overall Index
2
Overall Quick
Overall Rating
676
Pipe schematic from manhole 18 0758 to 18 0757
MH: 18 0758MH: 18 0757downstream0 ft. AMH - Upstream Manhole, Survey Begins - 18 07580 ft. MWL - Water Level, 30 %of cross sectional area0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. MGO - General Observation - COCKROACHES IN MANHOLE2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. MGO - General Observation - MAG COATING7.3 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start488.9 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish488.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish489 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish489.4 ft. AMH - Downstream Manhole, Survey Ends - 18 0757489.4 ft. MGO - General Observation - COCKROACHES IN MANHOLE

Observation photos (5)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - MAG COATING

    2 ft. - General Observation - MAG COATING

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    7.3 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    489.4 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (13)

DistanceCodeObservation
0AMH18 0758
489SSS
0MWL
2SSS
7.3SAP
489.4AMH18 0757
489.4MGOCOCKROACHES IN MANHOLE
2DAGS
2MGOMAG COATING
0MWM
488.9SAP
0MGOCOCKROACHES IN MANHOLE
488.9DAGS

Properties (7)

additional_info
630098052622201
custom_field_three
PROJECTING AGGREGATE
custom_field_two
3
customer
1
datetime
2022-05-27T00:28:41-07:00
documentation
PRO PIPE
is_lateral_inspection
false