Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 11, 2022, 06:30 AM
  • 01 0208_01 0207_08102022_233933.mp4

Date
08/10/2022
W/O
967226
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00202
PipeID
P01250
Time
11:30 PM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10276
Sewer Name
01 COMPTON AVENUE TRUNK
City
LOS ANGELES
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
09
Purpose
Routine Assessment
Project
RFIR_WO_967226_TV01011_AUG2022
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
01 0208
Downstream MH
01 0207
Dir. of Survey
Downstream
Length Surveyed
196.8 ft.
Total Length
196.8 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
3
Pipe schematic from manhole 01 0208 to 01 0207
MH: 01 0208MH: 01 0207downstream0 ft. AMH - Upstream Manhole, Survey Begins - 01 02080 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area2.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start13.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"17.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"20.7 ft. TS - Tap Saddle, at 02 o'clock, -, within 8 inches of joint: NO, 6"51.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"66.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"112.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"117.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"140.4 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"145.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"194.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish196.8 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK196.8 ft. AMH - Downstream Manhole, Survey Ends - 01 0207

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Saddle, at 02 o'clock, -, within 8 inches of joint: NO, 6"

    20.7 ft. - Tap Saddle, at 02 o'clock, -, within 8 inches of joint: NO, 6"

Observations (16)

DistanceCodeObservation
112.5TF
13.1TF
0AMH01 0208
194.6SAP
196.8MGOCONNECTION AT MH 9 O'CLOCK
20.7TS
145.7TF
66.7TF
0MWL
51.6TF
2.2SAP
117.8TF
140.4TF
0MWM
196.8AMH01 0207
17.9TF

Properties (7)

additional_info
630074081022202
custom_field_three
AGGREGATE PROJECTING
custom_field_two
3
customer
1
datetime
2022-08-10T23:30:39-07:00
documentation
PROPIPE
is_lateral_inspection
false