Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 18, 2022, 06:27 AM
  • E 0042_E 0041_08172022_234735.mp4

Date
08/17/2022
W/O
967135
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00028
PipeID
P11269
Time
11:27 PM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10286
Sewer Name
E JOINT OUTFALL E - UNIT 2
City
COMPTON
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
18
Purpose
Routine Assessment
Project
RFIR_WO_967135_TV01123_AUG2022
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
48 in.
Width
48 in.
Upstream MH
E 0042
Downstream MH
E 0041
Dir. of Survey
Downstream
Length Surveyed
607 ft.
Total Length
607 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
5
Pipe schematic from manhole E 0042 to E 0041
MH: E 0042MH: E 0041downstream0 ft. AMH - Upstream Manhole, Survey Begins - E 00420 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MWL - Water Level, 15 %of cross sectional area2.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.5 ft. MGO - General Observation - MAG COAT2.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start229.5 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"606.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish606.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish607 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK607 ft. AMH - Downstream Manhole, Survey Ends - E 0041

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.5 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.5 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (11)

DistanceCodeObservation
2.5SAP
0AMHE 0042
0MWM
2.5MGOMAG COAT
607MGOCONNECTION AT MH 9 O'CLOCK
2.5SSS
606.2SAP
229.5TF
607AMHE 0041
606.2SSS
0MWL

Properties (7)

additional_info
630074081722201
custom_field_three
AGGREGATE PROJECTING/SPALLING
custom_field_two
2
customer
1
datetime
2022-08-17T23:27:43-07:00
documentation
PROPIPE
is_lateral_inspection
false