Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 18, 2022, 09:39 AM
  • E 0036_E 0035_08182022_025459.mp4

Date
08/18/2022
W/O
967135
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00028
PipeID
P11263
Time
2:39 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10286
Sewer Name
E JOINT OUTFALL E - UNIT 2
City
COMPTON
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
18
Purpose
Routine Assessment
Project
RFIR_WO_967135_TV01123_AUG2022
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
48 in.
Width
48 in.
Upstream MH
E 0036
Downstream MH
E 0035
Dir. of Survey
Downstream
Length Surveyed
602 ft.
Total Length
602 ft.
Structural Index
3
Structural Quick
3W2W
Structural Rating
595
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
595
Pipe schematic from manhole E 0036 to E 0035
MH: E 0036MH: E 0035downstream0 ft. AMH - Upstream Manhole, Survey Begins - E 00360 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area3.3 ft. MGO - General Observation - MAG COAT MISSING IN "SPOTS" - 8 TO 4 O'CLOCK THROUGHOUT LINE.3.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start3.4 ft. MGO - General Observation - MAG COAT3.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start597.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish597.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish602 ft. AMH - Downstream Manhole, Survey Ends - E 0035

Observation photos (2)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.4 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.4 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (10)

DistanceCodeObservation
3.4SSS
0AMHE 0036
602AMHE 0035
3.4MGOMAG COAT
0MWL
597.8SSS
597.8SAP
3.3MGOMAG COAT MISSING IN "SPOTS" - 8 TO 4 O'CLOCK THROUGHOUT LINE.
0MWM
3.4SAP

Properties (7)

additional_info
630074081722201
custom_field_three
AGGREGATE PROJECTING/SPALLING
custom_field_two
2
customer
1
datetime
2022-08-18T02:39:56-07:00
documentation
PROPIPE
is_lateral_inspection
false