Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 8, 2022, 10:13 AM
  • H 1432_H 1431_09082022_032906.mp4

Date
09/08/2022
W/O
966751
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z01204
PipeID
P16304
Time
3:13 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10414
Sewer Name
H JOINT OUTFALL H - UNIT 8M
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
31
Purpose
Routine Assessment
Project
RFIR_WO_966751_TV22174_AUG2022
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Width
24 in.
Upstream MH
H 1432
Downstream MH
H 1431
Dir. of Survey
Downstream
Length Surveyed
369 ft.
Total Length
369 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
5
Pipe schematic from manhole H 1432 to H 1431
MH: H 1432MH: H 1431downstream0 ft. AMH - Upstream Manhole, Survey Begins - H 14320 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area2.1 ft. MGO - General Observation - MAG COAT2.1 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start44.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"75.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"107 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"139.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"171.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"187.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"242.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"259 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"298.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"314.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"366.8 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish366.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish369 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK369 ft. AMH - Downstream Manhole, Survey Ends - H 1431

Observation photos (2)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (20)

DistanceCodeObservation
107TF
366.8SAV
2.1MGOMAG COAT
369MGOCONNECTION AT MH 3 O'CLOCK
75.6TF
369AMHH 1431
366.8SSS
259TF
298.7TFC
0AMHH 1432
0MWL
314.7TF
187.1TF
2.1SAV
139.8TF
44.1TF
0MWM
2.1SSS
171.6TF
242.7TF

Properties (7)

additional_info
630074090722201
custom_field_three
SURFACE SPALLING/ AGGREGATE VISIBLE
custom_field_two
3
customer
1
datetime
2022-09-08T03:13:17-07:00
documentation
PROPIPE
is_lateral_inspection
false