Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 8, 2022, 05:11 AM
  • H 1390_H 1389_09072022_221812.mp4

Date
09/07/2022
W/O
966751
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z01204
PipeID
P16264
Time
10:11 PM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10414
Sewer Name
H JOINT OUTFALL H - UNIT 8M
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
35
Purpose
Routine Assessment
Project
RFIR_WO_966751_TV22174_AUG2022
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Width
30 in.
Upstream MH
H 1390
Downstream MH
H 1389
Dir. of Survey
Downstream
Length Surveyed
144.8 ft.
Total Length
144.8 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
5
Pipe schematic from manhole H 1390 to H 1389
MH: H 1390MH: H 1389downstream0 ft. AMH - Upstream Manhole, Survey Begins - H 13900 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MWL - Water Level, 25 %of cross sectional area3.3 ft. MGO - General Observation - MAG COAT3.3 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start3.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start11.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"35 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"58.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"82.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"106.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"130.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"143.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish143.6 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish144.8 ft. AMH - Downstream Manhole, Survey Ends - H 1389

Observation photos (2)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.3 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.3 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (16)

DistanceCodeObservation
3.3MGOMAG COAT
143.6SSS
35TFC
143.6SAV
0AMHH 1390
0MGOCONNECTION AT MH 3 O'CLOCK
106.6TFC
11.1TFC
58.9TF
130.7TFC
0MWM
3.3SAV
0MWL
144.8AMHH 1389
3.3SSS
82.5TFC

Properties (7)

additional_info
630074090722201
custom_field_three
SURFACE SPALLING/ AGGREGATE VISIBLE
custom_field_two
3
customer
1
datetime
2022-09-07T22:11:12-07:00
documentation
PROPIPE
is_lateral_inspection
false