Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 8, 2022, 05:18 AM
  • H 1389_H 1388_09072022_223357.mp4

Date
09/07/2022
W/O
966751
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z01204
PipeID
P16263
Time
10:18 PM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10414
Sewer Name
H JOINT OUTFALL H - UNIT 8M
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
35
Purpose
Routine Assessment
Project
RFIR_WO_966751_TV22174_AUG2022
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Width
30 in.
Upstream MH
H 1389
Downstream MH
H 1388
Dir. of Survey
Downstream
Length Surveyed
400.5 ft.
Total Length
400.5 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
5
Pipe schematic from manhole H 1389 to H 1388
MH: H 1389MH: H 1388downstream0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - H 13890 ft. MWM - Water Mark, 25 %of cross sectional area2.6 ft. MGO - General Observation - MAG COAT2.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES2.6 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start12.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"36.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"60.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"84.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"131.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"163.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"251 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"274.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"299 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"322.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"346.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"370.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"397.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish397.7 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish400.5 ft. AMH - Downstream Manhole, Survey Ends - H 1388

Observation photos (2)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES

    2.6 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.6 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (21)

DistanceCodeObservation
397.7SSS
131.8TFC
0MWL
84.4TFC
12.5TFC
0AMHH 1389
274.8TFC
251TFC
2.6MGOMAG COAT
2.6SSS
370.2TF
163.5TF
36.3TFC
346.6TFC
322.5TF
397.7SAV
0MWM
400.5AMHH 1388
299TFC
60.5TFC
2.6SAV

Properties (7)

additional_info
630074090722201
custom_field_three
SURFACE SPALLING/ AGGREGATE VISIBLE
custom_field_two
3
customer
1
datetime
2022-09-07T22:18:39-07:00
documentation
PROPIPE
is_lateral_inspection
false