Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 31, 2022, 09:52 AM
  • 05 2420_05 2419_08312022_030555.mp4

Date
08/31/2022
W/O
966818
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00458
PipeID
P07532
Time
2:52 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10404
Sewer Name
05 INGLEWOOD DIVERSION TRUNK
City
INGLEWOOD
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
04
Purpose
Routine Assessment
Project
RFIR_WO_966818_TV05039_AUG2022
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
24 in.
Width
24 in.
Upstream MH
05 2420
Downstream MH
05 2419
Dir. of Survey
Downstream
Length Surveyed
360.9 ft.
Total Length
360.9 ft.
Structural Index
3
Structural Quick
3300
Structural Rating
9
O&M Index
3
O&M Quick
3100
O&M Rating
3
Overall Index
3
Overall Quick
Overall Rating
12
Pipe schematic from manhole 05 2420 to 05 2419
MH: 05 2420MH: 05 2419downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - 05 24200 ft. MWM - Water Mark, 25 %of cross sectional area2.1 ft. DSZ - Deposits Settled Other, 20 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start17.7 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES29.2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start84.4 ft. DSZ - Deposits Settled Other, 20 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish125.3 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: NO, 6"180.6 ft. TS - Tap Saddle, at 12 o'clock, -, within 8 inches of joint: NO, 6"230.8 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"280.7 ft. TS - Tap Saddle, at 12 o'clock, -, within 8 inches of joint: NO, 6"354.7 ft. FL - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES360.7 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish360.9 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK360.9 ft. AMH - Downstream Manhole, Survey Ends - 05 2419

Observation photos (7)

  • Deposits Settled Other,  20 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2.1 ft. - Deposits Settled Other, 20 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    17.7 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    29.2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: NO, 6"

    125.3 ft. - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: NO, 6"

  • Tap Saddle, at 12 o'clock, -, within 8 inches of joint: NO, 6"

    180.6 ft. - Tap Saddle, at 12 o'clock, -, within 8 inches of joint: NO, 6"

  • Tap Saddle, at 12 o'clock, -, within 8 inches of joint: NO, 6"

    280.7 ft. - Tap Saddle, at 12 o'clock, -, within 8 inches of joint: NO, 6"

  • Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES

    354.7 ft. - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES

Observations (16)

DistanceCodeObservation
180.6TS
360.9MGOCONNECTION AT MH 9 O'CLOCK
0MWL
230.8TF
0MGOCONNECTION AT MH 3 O'CLOCK
84.4DSZ
2.1DSZ
280.7TS
29.2CM
0AMH05 2420
17.7CM
0MWM
354.7FL
360.9AMH05 2419
125.3TF
360.7CM

Properties (8)

additional_info
630074083022205
custom_field_three
MULTIPLE CRACKS
custom_field_two
3
customer
1
datetime
2022-08-31T02:52:00-07:00
documentation
PROPIPE
is_lateral_inspection
false
year_laid
33163