Wastewater/Activity/PacpInspection/1.0Aug 17, 2022, 05:37 AM
  • 01 0247_01 0246_08162022_224934.mp4

Date
08/16/2022
W/O
967125
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00218
PipeID
P01292
Time
10:37 PM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10285
Sewer Name
01 SOUTH PARK AVENUE TRUNK
City
LOS ANGELES
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
12
Purpose
Routine Assessment
Project
RFIR_WO_967125_TV01205_AUG2022
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Width
10 in.
Upstream MH
01 0247
Downstream MH
01 0246
Dir. of Survey
Downstream
Length Surveyed
328.5 ft.
Total Length
328.5 ft.
Structural Index
4
Structural Quick
4300
Structural Rating
12
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
4
Overall Quick
Overall Rating
12
Pipe schematic from manhole 01 0247 to 01 0246
MH: 01 0247MH: 01 0246downstream0 ft. MWM - Water Mark, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 01 02470 ft. MGO - General Observation - CONNECTION AT MH 9'OCLOCK CAPPED0 ft. MWL - Water Level, 10 %of cross sectional area7.6 ft. FM - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start60.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"99.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"155 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"208.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"251.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"273.8 ft. FM - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish276.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"289.6 ft. FM - Fracture Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES301.3 ft. FM - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start326.9 ft. FM - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish328.5 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK328.5 ft. AMH - Downstream Manhole, Survey Ends - 01 0246328.5 ft. MGO - General Observation - CONNECTION AT MH 12 O'CLOCK

Observation photos (3)

  • Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    7.6 ft. - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Fracture Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES

    289.6 ft. - Fracture Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    301.3 ft. - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (18)

DistanceCodeObservation
301.3FM
328.5MGOCONNECTION AT MH 3 O'CLOCK
99.8TFC
155TFC
273.8FM
328.5AMH01 0246
289.6FM
326.9FM
7.6FM
60.6TFC
0MWM
208.2TF
251.8TFC
0AMH01 0247
328.5MGOCONNECTION AT MH 12 O'CLOCK
0MGOCONNECTION AT MH 9'OCLOCK CAPPED
276.6TFC
0MWL

Properties (7)

additional_info
630074081622201
custom_field_three
MULTIPLE FRACTURE'S