Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 4, 2022, 07:32 AM
  • 05 1524_05 1523_08042022_004827.mp4

Date
08/04/2022
W/O
967330
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00528
PipeID
P06746
Time
12:32 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10265
Sewer Name
05 TORRANCE EXTENSION TRUNK
City
TORRANCE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
29
Purpose
Routine Assessment
Project
RFIR_WO_967330_TV05210_AUG2022
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
15 in.
Upstream MH
05 1523
Downstream MH
05 1524
Dir. of Survey
Upstream
Length Surveyed
336 ft.
Total Length
336 ft.
Structural Index
4
Structural Quick
4231
Structural Rating
11
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
4
Overall Quick
Overall Rating
11
Pipe schematic from manhole 05 1523 to 05 1524
MH: 05 1523MH: 05 1524upstream0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Ends - 05 15240 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish6.7 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES71.5 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"133.7 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"183.6 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"235 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"271.1 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"304.3 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"324.3 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start328 ft. FM - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES336 ft. MWL - Water Level, 5 %of cross sectional area336 ft. MWM - Water Mark, 10 %of cross sectional area336 ft. AMH - Downstream Manhole, Survey Begins - 05 1523

Observation photos (3)

  • Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

    8 ft. - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    11.7 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    329.3 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

Observations (15)

DistanceCodeObservation
0MWL
0MWM
329.3FM
202.3TF
8FM
336MGOCONNECTION AT MH 9 O'CLOCK
31.7TF
101TF
152.4TF
336AMH05 1524
264.5TFC
336CM
64.9TF
11.7CM
0AMH05 1523

Properties (7)

additional_info
630074080322201
custom_field_three
MULTIPLE CRACKS/FRACTURE'S
custom_field_two
2
customer
1
datetime
2022-08-04T00:32:14-07:00
documentation
PROPIPE
is_lateral_inspection
false