Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 4, 2022, 05:05 AM
  • 05 1513_05 1512_08032022_222356.mp4

Date
08/03/2022
W/O
967330
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00528
PipeID
P06735
Time
10:05 PM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10265
Sewer Name
05 TORRANCE EXTENSION TRUNK
City
TORRANCE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
29
Purpose
Routine Assessment
Project
RFIR_WO_967330_TV05210_AUG2022
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
10 in.
Width
15 in.
Upstream MH
05 1513
Downstream MH
05 1512
Dir. of Survey
Downstream
Length Surveyed
362.1 ft.
Total Length
362.1 ft.
Structural Index
3
Structural Quick
4133
Structural Rating
13
O&M Index
1
O&M Quick
2112
O&M Rating
4
Overall Index
2
Overall Quick
Overall Rating
17
Pipe schematic from manhole 05 1513 to 05 1512
MH: 05 1513MH: 05 1512downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 05 15130 ft. MWM - Water Mark, 20 %of cross sectional area4.1 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start15 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"36.6 ft. FL - Fracture Longitudinal, at 04 o'clock, within 8 inches of joint: YES47.6 ft. RFJ - Roots Fine Joint, from 08 to 03 o'clock, within 8 inches of joint: YES68.7 ft. RFJ - Roots Fine Joint, from 10 to 11 o'clock, within 8 inches of joint: YES83.6 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"108.1 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish108.2 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start124 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"157 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"171.4 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish171.5 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start241.4 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"358.4 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: YES359.6 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish362.1 ft. AMH - Downstream Manhole, Survey Ends - 05 1512

Observation photos (7)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    4.1 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Fracture Longitudinal, at 04 o'clock, within 8 inches of joint: YES

    36.6 ft. - Fracture Longitudinal, at 04 o'clock, within 8 inches of joint: YES

  • Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"

    83.6 ft. - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    108.2 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    171.5 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Settled Other,  10 %of cross sectional area, at 06 o'clock,  , within 8 inches of joint: YES

    358.4 ft. - Deposits Settled Other, 10 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

    359.6 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observations (19)

DistanceCodeObservation
0MWL
241.4TFC
68.7RFJ
171.4FM
0AMH05 1513
157TF
108.1CM
47.6RFJ
124TFC
358.4DSZ
36.6FL
171.5CM
15TF
0MWM
359.6CM
4.1CM
362.1AMH05 1512
108.2FM
83.6TBA

Properties (7)

additional_info
630074080322201
custom_field_three
MULTIPLE CRACKS/FRACTURE'S
custom_field_two
2
customer
1
datetime
2022-08-03T22:05:33-07:00
documentation
PROPIPE
is_lateral_inspection
false