29 0370_29 0369_07062022_032006.mp4
2.2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2.2 ft. - General Observation - PIPE IS NRCP
5.8 ft. - Hole, at 10 o'clock, within 8 inches of joint: NO
9.7 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
9.7 ft. - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YES
147.9 ft. - Tap Break-In, at 09 o'clock, -, within 8 inches of joint: YES, 6"
215.3 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 10 to 02 o'clock, , within 8 inches of joint: YES
218.2 ft. - Material Change, Vitrified clay pipe
218.2 ft. - Fracture Spiral, from 10 to 12 o'clock, within 8 inches of joint: YES
| Distance | Code | Observation |
|---|---|---|
| 219.8 | AOC | 29 0369 |
| 9.7 | FM | — |
| 215.3 | DAGS | — |
| 0 | MWM | — |
| 8.2 | TF | — |
| 5.8 | H | — |
| 147.9 | TB | — |
| 218.2 | MMC | — |
| 2.2 | SAP | — |
| 207.3 | TF | — |
| 218.2 | FS | — |
| 9.7 | RFJ | — |
| 0 | MGO | CONNECTION AT MH 3 O'CLOCK |
| 0 | MWL | — |
| 0 | AMH | 29 0370 |
| 109.4 | TF | — |
| 218.2 | FM | — |
| 2.2 | MGO | PIPE IS NRCP |
| 218.2 | SAP | — |