Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 3, 2022, 06:58 AM
  • 32 0082_32 0081A_06032022_010537.mp4

Date
06/02/2022
W/O
957080
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00889
PipeID
P22254
Time
11:58 PM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10138
Sewer Name
32 RYE CANYON TRUNK
City
VALENCIA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 32
Page No.
06
Purpose
Routine Assessment
Project
RFIR_WO_957080_TV32051_JUN2022
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
21 in.
Width
21 in.
Upstream MH
32 0082
Downstream MH
32 0081A
Dir. of Survey
Downstream
Length Surveyed
119.2 ft.
Total Length
119.2 ft.
Structural Index
4
Structural Quick
4731
Structural Rating
31
O&M Index
2
O&M Quick
2D00
O&M Rating
50
Overall Index
2
Overall Quick
Overall Rating
81
Pipe schematic from manhole 32 0082 to 32 0081A
MH: 32 0082MH: 32 0081Adownstream0 ft. AMH - Upstream Manhole, Survey Begins - 32 00820 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 15 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2.5 ft. FS - Fracture Spiral, from 02 to 06 o'clock, within 8 inches of joint: YES75.9 ft. FM - Fracture Multiple, from 12 to 12 o'clock, within 8 inches of joint: YES, Start99.5 ft. DAE - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start105.2 ft. DAE - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Finish109.6 ft. FM - Fracture Multiple, from 12 to 12 o'clock, within 8 inches of joint: YES, Finish117.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish119.2 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK119.2 ft. AMH - Downstream Manhole, Survey Ends - 32 0081A

Observation photos (4)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Fracture Spiral, from 02 to 06 o'clock, within 8 inches of joint: YES

    2.5 ft. - Fracture Spiral, from 02 to 06 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 12 to 12 o'clock, within 8 inches of joint: YES, Start

    75.9 ft. - Fracture Multiple, from 12 to 12 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES, Start

    99.5 ft. - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start

Observations (12)

DistanceCodeObservation
0AMH32 0082
2DAGS
119.2MGOACTIVE CONNECTION AT MH 9 O'CLOCK
105.2DAE
0MWL
99.5DAE
117.2DAGS
109.6FM
2.5FS
75.9FM
119.2AMH32 0081A
0MWM

Properties (7)

additional_info
630063060222202
custom_field_three
FRACTURES/CRACKS
custom_field_two
2
customer
1
datetime
2022-06-02T23:58:09-07:00
documentation
PRO PIPE
is_lateral_inspection
false