19 0226_19 0225_08222022_022240.mp4
2.1 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
9.6 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
29.8 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 05 o'clock, , within 8 inches of joint: YES
30.7 ft. - Tap Break-In Intruding, at 12 o'clock, -, -, within 8 inches of joint: NO, 6", 1"
103.2 ft. - Tap Break-In Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"
122.8 ft. - Surface Reinforcement Visible, from 11 to 03 o'clock, within 8 inches of joint: YES
125.8 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
181.3 ft. - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6" - Tap Break-In Defective
182.5 ft. - Tap Break-In Intruding, at 10 o'clock, -, -, within 8 inches of joint: NO, 6", 1" - Tap Break-In Protruding approximately 2"
194.5 ft. - Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: NO
253.1 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: NO, Start
254.7 ft. - Tap Break-In Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"
323.1 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES
| Distance | Code | Observation |
|---|---|---|
| 125.8 | SAP | — |
| 0 | MWL | — |
| 29.8 | DAGS | — |
| 2.1 | SAV | — |
| 182.5 | TBI | Tap Break-In Protruding approximately 2" |
| 323.5 | SAP | — |
| 323.1 | DAGS | — |
| 0 | AMH | 19 0225 |
| 323.5 | SRV | — |
| 329.5 | AMH | 19 0226 |
| 323.4 | SSS | — |
| 254.7 | TBC | — |
| 9.6 | SSS | — |
| 181.3 | TB | Tap Break-In Defective |
| 194.5 | SRV | — |
| 125.8 | SAV | — |
| 253.1 | SRV | — |
| 103.2 | TBC | — |
| 0 | MWM | — |
| 122.8 | SRV | — |
| 30.7 | TBI | — |