Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 16, 2022, 10:59 AM
  • F 0099_F 0097_08162022_041353.mp4

Date
08/16/2022
W/O
967264
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00041
PipeID
P10229
Time
3:59 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10330
Sewer Name
F JOINT OUTFALL F - UNIT 5
City
NORWALK
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
33
Purpose
Routine Assessment
Project
RFIR_WO_967264_TV02408_AUG2022
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Width
15 in.
Upstream MH
F 0099
Downstream MH
F 0097
Dir. of Survey
Downstream
Length Surveyed
270.3 ft.
Total Length
270.3 ft.
Structural Index
5
Structural Quick
5100
Structural Rating
5
O&M Index
2
O&M Quick
2U00
O&M Rating
216
Overall Index
2
Overall Quick
Overall Rating
221
Pipe schematic from manhole F 0099 to F 0097
MH: F 0099MH: F 0097downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - F 00992 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start20.9 ft. TBA - Tap Break-In Active, at 01 o'clock, -, within 8 inches of joint: NO, 6"30.9 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, at 09 o'clock, , within 8 inches of joint: YES33.1 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"86.2 ft. TFD - Tap Factory Made Defective, at 02 o'clock, -, within 8 inches of joint: NO, 6"86.4 ft. HVV - Hole Void Visible, from 12 to 03 o'clock, within 8 inches of joint: YES135.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"194.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"218.5 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: NO, 6"269.2 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Finish269.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish270.3 ft. MGO - General Observation - CONNECTIONS IN MH AT BOTH 3 AND 12 O' CLOCK270.3 ft. AMH - Downstream Manhole, Survey Ends - F 0097

Observation photos (4)

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 10 %of cross sectional area, at 09 o'clock,  , within 8 inches of joint: YES

    30.9 ft. - Deposits Attached Grease, 10 %of cross sectional area, at 09 o'clock, , within 8 inches of joint: YES

  • Hole Void Visible, from 12 to 03 o'clock, within 8 inches of joint: YES

    86.4 ft. - Hole Void Visible, from 12 to 03 o'clock, within 8 inches of joint: YES

Observations (17)

DistanceCodeObservation
2DAE
86.2TFD
269.2DAE
270.3MGOCONNECTIONS IN MH AT BOTH 3 AND 12 O' CLOCK
270.3AMHF 0097
30.9DAGS
135.8TFC
20.9TBA
0MWL
86.4HVV
0MWM
269.2DAGS
218.5TFC
194.1TFC
2DAGS
33.1TFA
0AMHF 0099

Properties (7)

additional_info
630098081522205
custom_field_three
HOLE VOID VISIBLE
custom_field_two
2
customer
1
datetime
2022-08-16T03:59:15-07:00
documentation
PRO PIPE
is_lateral_inspection
false