Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 9, 2022, 08:43 AM
  • E 0102_E 0101_08092022_015150.mp4

Date
08/09/2022
W/O
967221
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00031
PipeID
P11329
Time
1:43 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10270
Sewer Name
E JOINT OUTFALL E - UNIT 4 RELOCATION
City
WATTS
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
13
Purpose
Routine Assessment
Project
RFIR_WO_967221_TV01285_AUG2022
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Width
30 in.
Upstream MH
E 0102
Downstream MH
E 0101
Dir. of Survey
Downstream
Length Surveyed
37.7 ft.
Total Length
37.7 ft.
Structural Index
3
Structural Quick
5131
Structural Rating
10
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
10
Pipe schematic from manhole E 0102 to E 0101
MH: E 0102MH: E 0101downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - E 01020 ft. MWM - Water Mark, 35 %of cross sectional area2.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.1 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start37.7 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish37.7 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK37.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish37.7 ft. AMH - Downstream Manhole, Survey Ends - E 010137.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (11)

DistanceCodeObservation
2.1SAP
37.7SRV
37.7MGOCONNECTION AT MH 3 O'CLOCK
37.7SAP
0MWL
2.1SRV
0AMHE 0102
0MWM
2.1SSS
37.7AMHE 0101
37.7SSS

Properties (8)

additional_info
630074080822204
custom_field_three
AGGREGATE PROJECTING/SPALLING/REINFORCEMENT VISIBL
custom_field_two
2
customer
1
datetime
2022-08-09T01:43:46-07:00
documentation
PROPIPE
is_lateral_inspection
false
year_laid
30530