Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 15, 2022, 07:58 AM
  • 14 0401A_14 0401_06152022_010614.mp4

Date
06/15/2022
W/O
957004
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00581
PipeID
P18484
Time
12:58 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10147
Sewer Name
14 TRUNK "E"
City
LANCASTER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
17
Purpose
Routine Assessment
Project
RFIR_WO_957004_TV14025_JUN2022
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
14 0401A
Downstream MH
14 0401
Dir. of Survey
Downstream
Length Surveyed
83.1 ft.
Total Length
83.1 ft.
Structural Index
3
Structural Quick
3B2B
Structural Rating
80
O&M Index
2
O&M Quick
2B00
O&M Rating
32
Overall Index
2
Overall Quick
Overall Rating
112
Pipe schematic from manhole 14 0401A to 14 0401
MH: 14 0401AMH: 14 0401downstream0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 14 0401A0 ft. MWM - Water Mark, 30 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start22.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"46.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"71.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"80.8 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish80.8 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish80.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish83.1 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE83.1 ft. AMH - Downstream Manhole, Survey Ends - 14 040183.1 ft. MGO - General Observation - ROACHES @ MH

Observation photos (4)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - ROACHES @ MH

    83.1 ft. - General Observation - ROACHES @ MH

Observations (15)

DistanceCodeObservation
0MWL
2DAGS
80.8SSS
0AMH14 0401A
83.1MGOCONN @ MH 3 O'CLOCK/ACTIVE
83.1AMH14 0401
80.8SAP
83.1MGOROACHES @ MH
0MWM
71.3TFC
46.9TFC
22.6TFC
2SAP
80.8DAGS
2SSS

Properties (7)

additional_info
630063061422201
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2022-06-15T00:58:39-07:00
documentation
PRO PIPE
is_lateral_inspection
false