Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 15, 2022, 08:23 AM
  • 14 0399_14 0398_06152022_013600.mp4

Date
06/15/2022
W/O
957004
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00581
PipeID
P18481
Time
1:23 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10147
Sewer Name
14 TRUNK "E"
City
LANCASTER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
17
Purpose
Routine Assessment
Project
RFIR_WO_957004_TV14025_JUN2022
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
14 0399
Downstream MH
14 0398
Dir. of Survey
Downstream
Length Surveyed
277.9 ft.
Total Length
277.9 ft.
Structural Index
2
Structural Quick
3J2U
Structural Rating
385
O&M Index
2
O&M Quick
2J00
O&M Rating
110
Overall Index
2
Overall Quick
Overall Rating
495
Pipe schematic from manhole 14 0399 to 14 0398
MH: 14 0399MH: 14 0398downstream0 ft. MWL - Water Level, 30 %of cross sectional area0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 14 03992 ft. MWLS - Water Level, Sag in pipe, 10 %of cross sectional area, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start11.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"35.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"63.9 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"88.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"112.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"137 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"165.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"206.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"230.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"254.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"275 ft. MWLS - Water Level, Sag in pipe, 10 %of cross sectional area, Finish275.6 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish275.6 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish277.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish277.9 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE277.9 ft. MGO - General Observation - ROACHES @ MH277.9 ft. AMH - Downstream Manhole, Survey Ends - 14 0398

Observation photos (4)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - ROACHES @ MH

    277.9 ft. - General Observation - ROACHES @ MH

Observations (24)

DistanceCodeObservation
277.9DAGS
0MWL
0MWM
206.1TFC
11.4TFC
230.7TFC
277.9MGOCONN @ MH 3 O'CLOCK/ACTIVE
2MWLS
35.6TFC
0AMH14 0399
2DAGS
112.7TFC
137TFC
2SAP
275.6SAP
63.9TFA
277.9MGOROACHES @ MH
88.2TFC
2SSS
275.6SSS
277.9AMH14 0398
165.5TFC
275MWLS
254.7TFC

Properties (7)

additional_info
630063061422201
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2022-06-15T01:23:18-07:00
documentation
PRO PIPE
is_lateral_inspection
false