Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 11, 2022, 09:31 AM
  • B 0369_B 0368_08112022_024528.mp4

Date
08/11/2022
W/O
962477
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00091
PipeID
P08881
Time
2:31 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10321
Sewer Name
B JOINT OUTFALL B - UNIT 5A
City
TEMPLE CITY
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
10
Purpose
Routine Assessment
Project
WO_962477_TV15051_JUL2022
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
21 in.
Width
63 in.
Upstream MH
B 0369
Downstream MH
B 0368
Dir. of Survey
Downstream
Length Surveyed
239.5 ft.
Total Length
239.5 ft.
Structural Index
3
Structural Quick
3H2H
Structural Rating
235
O&M Index
2
O&M Quick
2H00
O&M Rating
94
Overall Index
2
Overall Quick
Overall Rating
329
Pipe schematic from manhole B 0369 to B 0368
MH: B 0369MH: B 0368downstream0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - B 03690 ft. MWM - Water Mark, 40 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start5.2 ft. MGO - General Observation - MAG COATING238 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish238 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish238 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish239.5 ft. MGO - General Observation - COCKROACHES IN MANHOLE239.5 ft. AMH - Downstream Manhole, Survey Ends - B 0368

Observation photos (5)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COATING

    5.2 ft. - General Observation - MAG COATING

  • General Observation - COCKROACHES IN MANHOLE

    239.5 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (13)

DistanceCodeObservation
2SAP
0MWL
5.2MGOMAG COATING
238SSS
0MGOCONNECTION AT MH 3 O'CLOCK
239.5MGOCOCKROACHES IN MANHOLE
238SAP
238DAGS
0AMHB 0369
239.5AMHB 0368
2DAGS
0MWM
2SSS

Properties (7)

additional_info
630098081022201
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2022-08-11T02:31:14-07:00
documentation
PRO PIPE
is_lateral_inspection
false