Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 11, 2022, 09:47 AM
  • B 0368_B 0367_08112022_031120.mp4

Date
08/11/2022
W/O
962477
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00091
PipeID
P08880
Time
2:47 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10321
Sewer Name
B JOINT OUTFALL B - UNIT 5A
City
TEMPLE CITY
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
10
Purpose
Routine Assessment
Project
WO_962477_TV15051_JUL2022
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
21 in.
Width
63 in.
Upstream MH
B 0368
Downstream MH
B 0367
Dir. of Survey
Downstream
Length Surveyed
245.5 ft.
Total Length
245.5 ft.
Structural Index
3
Structural Quick
3I2I
Structural Rating
240
O&M Index
2
O&M Quick
2I00
O&M Rating
96
Overall Index
2
Overall Quick
Overall Rating
336
Pipe schematic from manhole B 0368 to B 0367
MH: B 0368MH: B 0367downstream0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. AMH - Upstream Manhole, Survey Begins - B 03682 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start15.5 ft. MGO - General Observation - MAG COATING110.2 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"244.5 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish244.5 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish244.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish245.5 ft. MGO - General Observation - COCKROACHES IN MANHOLE245.5 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK245.5 ft. AMH - Downstream Manhole, Survey Ends - B 0367

Observation photos (6)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COATING

    15.5 ft. - General Observation - MAG COATING

  • General Observation - COCKROACHES IN MANHOLE

    245.5 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (15)

DistanceCodeObservation
110.2TBA
244.5SAP
0MWM
0MWL
0MGOCOCKROACHES IN MANHOLE
244.5SSS
244.5DAGS
245.5MGOCOCKROACHES IN MANHOLE
2SSS
245.5MGOCONNECTION AT MH 3 O'CLOCK
0AMHB 0368
2DAGS
245.5AMHB 0367
15.5MGOMAG COATING
2SAP

Properties (7)

additional_info
630098081022201
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2022-08-11T02:47:26-07:00
documentation
PRO PIPE
is_lateral_inspection
false