Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 12, 2022, 08:13 AM
  • B 0361_B 0360A_08122022_012459.mp4

Date
08/12/2022
W/O
962477
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00091
PipeID
P08873
Time
1:13 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10323
Sewer Name
B JOINT OUTFALL B - UNIT 5A
City
TEMPLE CITY
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
10
Purpose
Routine Assessment
Project
WO_962477_TV15051_JUL2022
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
21 in.
Width
63 in.
Upstream MH
B 0361
Downstream MH
B 0360A
Dir. of Survey
Downstream
Length Surveyed
256.2 ft.
Total Length
256.2 ft.
Structural Index
3
Structural Quick
3I2I
Structural Rating
250
O&M Index
2
O&M Quick
2I00
O&M Rating
100
Overall Index
2
Overall Quick
Overall Rating
350
Pipe schematic from manhole B 0361 to B 0360A
MH: B 0361MH: B 0360Adownstream0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - B 03610 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. MGO - General Observation - COCKROACHES IN MANHOLE2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start252.7 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish252.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish252.7 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish256.2 ft. AMH - Downstream Manhole, Survey Ends - B 0360A256.2 ft. MGO - General Observation - COCKROACHES IN MANHOLE256.2 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK

Observation photos (5)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    256.2 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (13)

DistanceCodeObservation
0MWL
2DAGS
256.2AMHB 0360A
252.7SAP
0AMHB 0361
252.7DAGS
256.2MGOCOCKROACHES IN MANHOLE
2SAP
0MWM
0MGOCOCKROACHES IN MANHOLE
2SSS
256.2MGOCONNECTION AT MH 3 O'CLOCK
252.7SSS

Properties (5)

additional_info
630098081122202
customer
1
datetime
2022-08-12T01:13:42-07:00
documentation
PRO PIPE
is_lateral_inspection
false