Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 11, 2022, 09:10 AM
  • 22 1069_22 1068_07112022_022734.mp4

Date
07/11/2022
W/O
962009
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00812
PipeID
P17440
Time
2:10 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10228
Sewer Name
22 IRWINDALE TRUNK, SECTS 2,3,4,&5
City
IRWINDALE
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
18
Purpose
Capital Improvement Program Assesment
Project
RFIR_WO_962009_TV22043_JUL2022
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
22 1069
Downstream MH
22 1068
Dir. of Survey
Downstream
Length Surveyed
231.5 ft.
Total Length
231.5 ft.
Structural Index
3
Structural Quick
3H2G
Structural Rating
219
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
219
Pipe schematic from manhole 22 1069 to 22 1068
MH: 22 1069MH: 22 1068downstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 10690 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK2 ft. SAP - Surface Aggregate Projecting, from 12 to 12 o'clock, within 8 inches of joint: YES, Start20.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start47.6 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"52.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"108.3 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"112.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"145.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"149.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"194.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"198.3 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"220.6 ft. TBA - Tap Break-In Active, at 11 o'clock, -, within 8 inches of joint: NO, 6"229.5 ft. SAP - Surface Aggregate Projecting, from 12 to 12 o'clock, within 8 inches of joint: YES, Finish229.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish231.5 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK231.5 ft. MGO - General Observation - COCKROACHES IN MANHOLE231.5 ft. AMH - Downstream Manhole, Survey Ends - 22 1068

Observation photos (4)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • Surface Aggregate Projecting, from 12 to 12 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 12 to 12 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    20.2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    231.5 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (21)

DistanceCodeObservation
0MWM
20.2SSS
0AMH22 1069
0MWL
231.5MGOCONNECTION AT MH 3 O'CLOCK
47.6TFA
52.2TFC
220.6TBA
231.5MGOCOCKROACHES IN MANHOLE
112.7TF
194.5TFC
2SAP
198.3TF
108.3TF
145.5TFC
231.5AMH22 1068
229.5SAP
229.5SSS
149.7TF
0MGOCOCKROACHES IN MANHOLE
0MGOCONNECTION AT MH 3 O'CLOCK

Properties (7)

additional_info
630098071122001
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2022-07-11T02:10:25-07:00
documentation
PRO PIPE
is_lateral_inspection
false