Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 13, 2022, 05:08 AM
  • 22 1061_22 1060_07122022_222045.mp4

Date
07/12/2022
W/O
962009
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00812
PipeID
P17432
Time
10:08 PM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10229
Sewer Name
22 IRWINDALE TRUNK, SECTS 2,3,4,&5
City
IRWINDALE
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
24
Purpose
Capital Improvement Program Assesment
Project
RFIR_WO_962009_TV22043_JUL2022
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
22 1061
Downstream MH
22 1060
Dir. of Survey
Downstream
Length Surveyed
289.4 ft.
Total Length
289.4 ft.
Structural Index
3
Structural Quick
3J2I
Structural Rating
271
O&M Index
2
O&M Quick
412J
O&M Rating
118
Overall Index
2
Overall Quick
Overall Rating
389
Pipe schematic from manhole 22 1061 to 22 1060
MH: 22 1061MH: 22 1060downstream0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MWM - Water Mark, 65 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 10610 ft. MGO - General Observation - COCKROACHES IN MANHOLE2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 02 to 10 o'clock, , within 8 inches of joint: YES, Start27.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"38.5 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start76.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"125.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"178.8 ft. TFA - Tap Factory Made Active, at 09 o'clock, -, within 8 inches of joint: NO, 6"227.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"286.6 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish286.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish286.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 02 to 10 o'clock, , within 8 inches of joint: YES, Finish289.4 ft. MGO - General Observation - COCKROACHES IN MANHOLE289.4 ft. AMH - Downstream Manhole, Survey Ends - 22 1060289.4 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK

Observation photos (5)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 02 to 10 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 02 to 10 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    38.5 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - CONNECTION AT MH 9 O'CLOCK

    289.4 ft. - General Observation - CONNECTION AT MH 9 O'CLOCK

Observations (18)

DistanceCodeObservation
38.5SSS
27.6TF
227.4TF
286.6SSS
0MWL
2SAP
289.4MGOCOCKROACHES IN MANHOLE
286.6SAP
0MWM
289.4AMH22 1060
2DAGS
286.6DAGS
0AMH22 1061
289.4MGOCONNECTION AT MH 9 O'CLOCK
178.8TFA
76.7TF
125.5TFC
0MGOCOCKROACHES IN MANHOLE

Properties (7)

additional_info
630098071222201
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2022-07-12T22:08:31-07:00
documentation
PRO PIPE
is_lateral_inspection
false