Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 13, 2022, 05:21 AM
  • 22 1060_22 1059_07122022_223316.mp4

Date
07/12/2022
W/O
962009
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00812
PipeID
P17431
Time
10:21 PM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10229
Sewer Name
22 IRWINDALE TRUNK, SECTS 2,3,4,&5
City
IRWINDALE
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
24
Purpose
Capital Improvement Program Assesment
Project
RFIR_WO_962009_TV22043_JUL2022
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 1060
Downstream MH
22 1059
Dir. of Survey
Downstream
Length Surveyed
304.4 ft.
Total Length
304.4 ft.
Structural Index
3
Structural Quick
3K2K
Structural Rating
300
O&M Index
2
O&M Quick
2K00
O&M Rating
120
Overall Index
2
Overall Quick
Overall Rating
420
Pipe schematic from manhole 22 1060 to 22 1059
MH: 22 1060MH: 22 1059downstream0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. MWL - Water Level, 35 %of cross sectional area0 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. AMH - Upstream Manhole, Survey Begins - 22 10600 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start61 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"113.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"166 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"219 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"267.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"301.8 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish301.8 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish301.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish304.4 ft. AMH - Downstream Manhole, Survey Ends - 22 1059

Observation photos (3)

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

Observations (17)

DistanceCodeObservation
267.2TFC
301.8SAP
301.8SSS
0MWM
0MWL
304.4AMH22 1059
61TFC
301.8DAGS
0MGOCOCKROACHES IN MANHOLE
219TFC
113.6TFC
2SSS
0AMH22 1060
166TFC
2SAP
2DAGS
0MGOCONNECTION AT MH 9 O'CLOCK

Properties (7)

additional_info
630098071222201
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2022-07-12T22:21:00-07:00
documentation
PRO PIPE
is_lateral_inspection
false