J 0012_J 0010_07282022_225423.mp4
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2 ft. - General Observation - MAG COATING
67 ft. - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: NO, 8"
105.5 ft. - Tap Break-In Active, at 01 o'clock, -, within 8 inches of joint: NO, 6"
113.6 ft. - Tap Break-In Active, at 11 o'clock, -, within 8 inches of joint: NO, 8"
151.1 ft. - Tap Break-In Active, at 11 o'clock, -, within 8 inches of joint: YES, 8"
172.4 ft. - Tap Break-In, at 01 o'clock, -, within 8 inches of joint: NO, 8"
206.7 ft. - Tap Break-In, at 11 o'clock, -, within 8 inches of joint: YES, 8"
| Distance | Code | Observation |
|---|---|---|
| 211.6 | SSS | — |
| 206.7 | TB | — |
| 151.1 | TBA | — |
| 2 | SSS | — |
| 212.1 | MGO | ACTIVE CONNECTION AT MH 3 O'CLOCK. |
| 0 | MGO | ACTIVE CONNECTIONS IN U/S MH - ONE AT 3 AND ONE AT 9 O' CLOCK. POSSIBLE BREAK-INS (BOTH CONNS. / "INSTALL POINTS" DAMAGED). |
| 0 | MWM | — |
| 0 | MWL | — |
| 105.5 | TBA | — |
| 0 | AMH | J 0012 |
| 113.6 | TBA | — |
| 172.4 | TB | — |
| 212.2 | AMH | J 0010 |
| 2 | MGO | MAG COATING |
| 67 | TBA | — |