Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 9, 2022, 09:01 AM
  • 18 0664_18 0663_08092022_021253.mp4

Date
08/09/2022
W/O
966752
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00696
PipeID
P14513
Time
2:01 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10318
Sewer Name
18 PHOEBE AVENUE TRUNK
City
LA MIRADA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
36
Purpose
Routine Assessment
Project
RFIR_WO_966752_TV18169_AUG2022
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
24 in.
Width
24 in.
Upstream MH
18 0664
Downstream MH
18 0663
Dir. of Survey
Downstream
Length Surveyed
251.2 ft.
Total Length
251.2 ft.
Structural Index
3
Structural Quick
3B21
Structural Rating
50
O&M Index
2
O&M Quick
2I00
O&M Rating
100
Overall Index
2
Overall Quick
Overall Rating
150
Pipe schematic from manhole 18 0664 to 18 0663
MH: 18 0664MH: 18 0663downstream0 ft. AMH - Upstream Manhole, Survey Begins - 18 06640 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. MWL - Water Level, 5 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start100.2 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"104.7 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"166.9 ft. CL - Crack Longitudinal, at 02 o'clock, within 8 inches of joint: YES170.2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start201.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"206.3 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"249.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish249.6 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish251.2 ft. AMH - Downstream Manhole, Survey Ends - 18 0663

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Crack Longitudinal, at 02 o'clock, within 8 inches of joint: YES

    166.9 ft. - Crack Longitudinal, at 02 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    170.2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (13)

DistanceCodeObservation
206.3TFA
104.7TFA
166.9CL
201.4TFC
249.6DAGS
100.2TFA
0AMH18 0664
249.6CM
251.2AMH18 0663
170.2CM
0MWM
2DAGS
0MWL

Properties (7)

additional_info
630098080822001
custom_field_three
CRACKS
custom_field_two
3
customer
1
datetime
2022-08-09T02:01:01-07:00
documentation
PRO PIPE
is_lateral_inspection
false