Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 7, 2022, 11:20 AM
  • B 0184_B 0183A_972022_042334.mp4

  • B 0184_B 0183A_972022_053004.mp4

Date
09/07/2022
W/O
0952131
Weather
Dry
Operator/Surveyor
SANTIAGO OBREGON
Sewer ID
Z00075
PipeID
P08668
Time
4:20 AM
Certificate
U-1014-06022541
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H3193
Sewer Name
B JOINT OUTFALL B - UNIT 1D
City
PICO RIVERA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
19
Purpose
Capital Improvement Program Assesment
Project
20220907_SHO_JOB_1D
Material
Reinforced Concrete Pipe
Shape
Circular
Height
57 in.
Upstream MH
B 0184
Downstream MH
B 0183A
Dir. of Survey
Downstream
Length Surveyed
607.8 ft.
Total Length
607.8 ft.
Structural Index
3
Structural Quick
5131
Structural Rating
10
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
10
Pipe schematic from manhole B 0184 to B 0183A
MH: B 0184MH: B 0183Adownstream0 ft. AMH - Upstream Manhole, Survey Begins - MH B 1840 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area3.9 ft. SRV - Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: YES, Start3.9 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start3.9 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start596.5 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish596.5 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish596.5 ft. SRV - Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: YES, Finish607.8 ft. AMH - Downstream Manhole, Survey Ends - MH B 183A

Observations (10)

DistanceCodeObservation
607.8AMHMH B 183A
0AMHMH B 184
596.5SAP
3.9SRV
596.5SSS
0MWM
3.9SAP
596.5SRV
0MWL
3.9SSS

Properties (7)

additional_info
RFIR
custom_field_three
REBAR AND AGG
custom_field_two
2
customer
LACSD
datetime
2022-09-07T04:20:54-07:00
documentation
OBREGON, BRAR, CASTILLO, OLIVER
is_lateral_inspection
false