Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 8, 2022, 08:40 AM
  • H 0327_B 0184A_982022_015049.mp4

Date
09/08/2022
W/O
0952131
Weather
Dry
Operator/Surveyor
SANTIAGO OBREGON
Sewer ID
Z00075
PipeID
P08670
Time
1:40 AM
Certificate
U-1014-06022541
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H3194
Sewer Name
B JOINT OUTFALL B - UNIT 1D
City
PICO RIVERA
Loc. details
Other
Location Code
Z
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
19
Purpose
Capital Improvement Program Assesment
Project
20220908_SHO_JOB_1D
Material
Reinforced Concrete Pipe
Shape
Circular
Height
54 in.
Upstream MH
H 0327
Downstream MH
B 0184A
Dir. of Survey
Downstream
Length Surveyed
59 ft.
Total Length
59 ft.
Structural Index
3
Structural Quick
5131
Structural Rating
10
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
10
Pipe schematic from manhole H 0327 to B 0184A
MH: H 0327MH: B 0184Adownstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - MH H 3270 ft. MWM - Water Mark, 35 %of cross sectional area17.1 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start17.4 ft. SRV - Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: YES, Start17.4 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start59 ft. AMH - Downstream Manhole, Survey Ends - MH B 184A59 ft. SRV - Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: YES, Finish59 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish59 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish

Observations (10)

DistanceCodeObservation
17.4SRV
59AMHMH B 184A
59SRV
0MWL
0AMHMH H 327
0MWM
59SAP
17.1SAP
59SSS
17.4SSS

Properties (7)

additional_info
RFIR
custom_field_three
REBAR
custom_field_two
2
customer
LACSD
datetime
2022-09-08T01:40:09-07:00
documentation
OBREGON, CASTILLO, BRAR, OLIVER
is_lateral_inspection
false