01 0206_01 0205_08112022_001227.mp4
2.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
13 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES
237.4 ft. - Surface Spalling, from 02 to 04 o'clock, within 8 inches of joint: YES
318.4 ft. - Material Change, Vitrified clay pipe
318.9 ft. - Crack Spiral, from 02 to 05 o'clock, within 8 inches of joint: YES
324.8 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES
333.7 ft. - Fracture Longitudinal, at 09 o'clock, within 8 inches of joint: YES
| Distance | Code | Observation |
|---|---|---|
| 0 | MWL | — |
| 164.7 | TF | — |
| 318.4 | SAP | — |
| 218 | TF | — |
| 0 | AMH | 01 0206 |
| 237.4 | SSS | — |
| 324.8 | CM | — |
| 2.1 | SAP | — |
| 263.9 | TF | — |
| 0 | MWM | — |
| 80.7 | TF | — |
| 134.4 | TF | — |
| 118.9 | TF | — |
| 337.1 | MGO | CONNECTION AT MH 3 O'CLOCK |
| 266.4 | TF | — |
| 0 | MGO | CONNECTION AT MH 9 O'CLOCK |
| 333.7 | FL | — |
| 40 | TF | — |
| 337.1 | AMH | 01 0205 |
| 202.9 | TF | — |
| 13 | FM | — |
| 256.3 | TF | — |
| 75.2 | TF | — |
| 318.4 | MMC | — |
| 315 | TF | — |
| 318.9 | CS | — |