Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 28, 2022, 09:57 AM
  • B 0402A_B 0402_07282022_031250.mp4

Date
07/28/2022
W/O
962162
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00091
PipeID
P08915
Time
2:57 AM
Certificate
U-0720-70309212
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9998
Sewer Name
B JOINT OUTFALL B - UNIT 5A
City
ARCADIA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary
District
DISTRICT 15
Page No.
07
Purpose
Routine Assessment
Project
WO_962162_TV15047_JUL2022
Sewer Type
Gravity
Material
NRCP
Shape
Other
Height
18 in.
Upstream MH
B 0402A
Downstream MH
B 0402
Dir. of Survey
Downstream
Length Surveyed
403.8 ft.
Total Length
403.8 ft.
Structural Index
3
Structural Quick
3O2O
Structural Rating
400
O&M Index
2
O&M Quick
312O
O&M Rating
163
Overall Index
2
Overall Quick
Overall Rating
563
Pipe schematic from manhole B 0402A to B 0402
MH: B 0402AMH: B 0402downstream0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK0 ft. MGO - General Observation - COCKROACHES IN MH0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - B 0402A2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start30.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"37.8 ft. RMC - Roots Medium Connection, from 01 to 04 o'clock, 15 %, within 8 inches of joint: YES37.8 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"66.1 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6"69.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"94.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"118.6 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6", 6"143.7 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish143.7 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start166.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"182.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"230.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"238.2 ft. TFA - Tap Factory Made Active, at 01 o'clock, -, within 8 inches of joint: NO, 6"294.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"347.7 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6"402 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish402 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish402 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish402.6 ft. MGO - General Observation - COCKROACHES IN MH403.8 ft. MGO - General Observation - CONNECTION AT MH AT 3 O'CLOCK AND 9 O'CLOCK403.8 ft. AMH - Downstream Manhole, Survey Ends - B 0402403.8 ft. MGO - General Observation - COCKROACHES IN MH

Observation photos (8)

  • General Observation - COCKROACHES IN MH

    0 ft. - General Observation - COCKROACHES IN MH

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Roots Medium Connection, from 01 to 04 o'clock, 15 %, within 8 inches of joint: YES

    37.8 ft. - Roots Medium Connection, from 01 to 04 o'clock, 15 %, within 8 inches of joint: YES

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    143.7 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MH

    402.6 ft. - General Observation - COCKROACHES IN MH

  • General Observation - COCKROACHES IN MH

    403.8 ft. - General Observation - COCKROACHES IN MH

Observations (30)

DistanceCodeObservation
143.7SAV
37.8RMC
0MWM
0MGOCONNECTION AT MH 3 O'CLOCK
402SSS
182.2TFC
118.6TFA
66.1TB
238.2TFA
402DAGS
403.8MGOCONNECTION AT MH AT 3 O'CLOCK AND 9 O'CLOCK
37.8TFA
403.8AMHB 0402
2SSS
402.6MGOCOCKROACHES IN MH
294.5TFC
69.9TFC
94.4TFC
2SAV
403.8MGOCOCKROACHES IN MH
143.7SAP
2DAGS
230.2TFC
30.1TF
0MGOCOCKROACHES IN MH
0MWL
347.7TB
0AMHB 0402A
166.3TFC
402SAP

Properties (7)

additional_info
630074072722203
custom_field_three
PROJECTING AGGREGATE/SPALLING
custom_field_two
2
customer
LACSD
datetime
2022-07-28T02:57:16-07:00
documentation
PRO PIPE
is_lateral_inspection
false