Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 3, 2022, 07:30 AM
  • 15 0320_H 0484_08032022_004341.mp4

Date
08/03/2022
W/O
961757
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00181
PipeID
P21379
Time
12:30 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10308
Sewer Name
H JOINT OUTFALL H - UNIT 6
City
CITY OF INDUSTRY
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
29
Purpose
Routine Assessment
Project
RFIR_WO_961757_TV15212_JUL2022
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
51 in.
Width
51 in.
Upstream MH
15 0320
Downstream MH
H 0484
Dir. of Survey
Downstream
Length Surveyed
334.9 ft.
Total Length
334.9 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
5
Pipe schematic from manhole 15 0320 to H 0484
MH: 15 0320MH: H 0484downstream0 ft. AMH - Upstream Manhole, Survey Begins - 15 03200 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK0 ft. MWL - Water Level, 20 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start245.7 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"250 ft. TBA - Tap Break-In Active, at 11 o'clock, -, within 8 inches of joint: NO, 6"331.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish331.4 ft. MGO - General Observation - COCKROACHES IN MH331.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish334.9 ft. AMH - Downstream Manhole, Survey Ends - H 0484

Observation photos (3)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MH

    331.4 ft. - General Observation - COCKROACHES IN MH

Observations (12)

DistanceCodeObservation
0AMH15 0320
2SSS
331.4SSS
0MWM
331.4MGOCOCKROACHES IN MH
0MGOCONNECTION AT MH 3 O'CLOCK
245.7TBA
331.4SAP
334.9AMHH 0484
2SAP
250TBA
0MWL

Properties (7)

additional_info
630074080222202
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2022-08-03T00:30:20-07:00
documentation
PRO PIPE
is_lateral_inspection
false