Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 25, 2022, 11:28 AM
  • 30 0245_30 0244_8252022_043616.mp4

Date
08/25/2022
W/O
0967059
Weather
Dry
Operator/Surveyor
SANTIAGO OBREGON
Sewer ID
Z00884
PipeID
P17946
Time
4:28 AM
Certificate
U-101406022541
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H3184
Sewer Name
30 VIA CAMPESINA TRUNK
City
PALOS VERDES ESTATES
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 30
Page No.
09
Purpose
Capital Improvement Program Assesment
Project
20220825_SB_VIA_CAMPESINA_TRUNK
Material
NRCP
Shape
Circular
Height
10 in.
Upstream MH
30 0245
Downstream MH
30 0244
Dir. of Survey
Downstream
Length Surveyed
213.1 ft.
Total Length
213.1 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
2
O&M Quick
3214
O&M Rating
10
Overall Index
2
Overall Quick
Overall Rating
15
Pipe schematic from manhole 30 0245 to 30 0244
MH: 30 0245MH: 30 0244downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - MH 2453 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start8 ft. RFJ - Roots Fine Joint, from 05 to 07 o'clock, within 8 inches of joint: YESR15.2 ft. RFJ - Roots Fine Joint, from 05 to 07 o'clock, within 8 inches of joint: YESR29.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"40.9 ft. RFJ - Roots Fine Joint, from 05 to 07 o'clock, within 8 inches of joint: YESR61.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"62.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4"65.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"67.7 ft. RFJ - Roots Fine Joint, from 05 to 07 o'clock, within 8 inches of joint: YESR, Start - EVERY OTHER JOINT103.4 ft. RMJ - Roots Medium Joint, from 09 to 04 o'clock, 15 %, within 8 inches of joint: YESR107 ft. RMJ - Roots Medium Joint, from 07 to 05 o'clock, 15 %, within 8 inches of joint: YESR146.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"157.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"212.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish212.6 ft. RFJ - Roots Fine Joint, from 05 to 07 o'clock, within 8 inches of joint: YESR, Finish212.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish213.1 ft. MGO - General Observation - CHANNEL IS VERY WORN213.1 ft. AMH - Downstream Manhole, Survey Ends - MH 244

Observations (22)

DistanceCodeObservation
29.7TFC
62.6TF
212.6SSS
0MWL
107RMJ
157.9TFC
103.4RMJ
8RFJ
212.6RFJ
0MWM
65.6TFC
213.1MGOCHANNEL IS VERY WORN
40.9RFJ
3SAP
61.5TFC
15.2RFJ
146.4TFC
213.1AMHMH 244
0AMHMH 245
67.7RFJEVERY OTHER JOINT
3SSS
212.6SAP

Properties (6)

custom_field_three
SPALLING AND AGG.
custom_field_two
2
customer
LACSD
datetime
2022-08-25T04:28:47-07:00
documentation
BRAR, OBREGON, CASTILLO
is_lateral_inspection
false