Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 26, 2022, 11:47 AM
  • 30 0242_30 0241_8262022_050022.mp4

Date
08/26/2022
W/O
0967059
Weather
Dry
Operator/Surveyor
SANTIAGO OBREGON
Sewer ID
Z00884
PipeID
P17943
Time
4:47 AM
Certificate
U-1014-06022541
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H3185
Sewer Name
30 VIA CAMPESINA TRUNK
City
PALOS VERDES
Loc. details
Other
Location Code
Z
Use of Sewer
Sanitary Sewer
District
District 30
Page No.
09
Purpose
Capital Improvement Program Assesment
Project
20220826_SHO_VIA_CMP_TR
Material
NRCP
Shape
Circular
Height
10 in.
Upstream MH
30 0242
Downstream MH
30 0241
Dir. of Survey
Downstream
Length Surveyed
178.4 ft.
Total Length
178.4 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
2
O&M Quick
3121
O&M Rating
6
Overall Index
2
Overall Quick
Overall Rating
11
Pipe schematic from manhole 30 0242 to 30 0241
MH: 30 0242MH: 30 0241downstream0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - MH 2424 ft. SAP - Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Start4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start5 ft. RMJ - Roots Medium Joint, from 08 to 05 o'clock, 10 %, within 8 inches of joint: YESR18.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4"20.7 ft. TFD - Tap Factory Made Defective, at 10 o'clock, -, within 8 inches of joint: NO, 4" - FULL OF ROOTS55 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"66.7 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: NO, 4"79.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"108.8 ft. RFJ - Roots Fine Joint, from 07 to 05 o'clock, within 8 inches of joint: YESR, Start176.3 ft. RFJ - Roots Fine Joint, from 07 to 05 o'clock, within 8 inches of joint: YESR, Finish176.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish176.3 ft. SAP - Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Finish178.4 ft. AMH - Downstream Manhole, Survey Ends - MH 241

Observations (16)

DistanceCodeObservation
4SAP
66.7TF
18.1TF
55TFC
79.1TFC
108.8RFJ
0MWL
176.3RFJ
20.7TFDFULL OF ROOTS
0MWM
176.3SSS
178.4AMHMH 241
0AMHMH 242
5RMJ
176.3SAP
4SSS

Properties (7)

additional_info
RFIR
custom_field_three
RFIR
custom_field_two
2
customer
LACSD
datetime
2022-08-26T04:47:53-07:00
documentation
OBREGON, CASTILLO, OLIVER
is_lateral_inspection
false