Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 26, 2022, 08:00 AM
  • 30 0244_30 0243_8262022_011510.mp4

Date
08/26/2022
W/O
0967059
Weather
Dry
Operator/Surveyor
SANTIAGO OBREGON
Sewer ID
Z00884
PipeID
P17945
Time
1:00 AM
Certificate
U-1014-06022541
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H3185
Sewer Name
30 VIA CAMPESINA TRUNK
City
PALOS VERDES
Loc. details
Other
Location Code
Z
Use of Sewer
Sanitary Sewer
District
District 30
Page No.
09
Purpose
Capital Improvement Program Assesment
Project
20220826_SHO_VIA_CMP_TR
Material
NRCP
Shape
Circular
Height
10 in.
Upstream MH
30 0244
Downstream MH
30 0243
Dir. of Survey
Downstream
Length Surveyed
226.2 ft.
Total Length
226.2 ft.
Structural Index
3
Structural Quick
3221
Structural Rating
8
O&M Index
1
O&M Quick
1100
O&M Rating
1
Overall Index
2
Overall Quick
Overall Rating
9
Pipe schematic from manhole 30 0244 to 30 0243
MH: 30 0244MH: 30 0243downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - MH 02440 ft. MGO - General Observation - CONNECTION IN MH AT 93 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start3 ft. SAV - Surface Aggregate Visible, from 07 to 05 o'clock, within 8 inches of joint: YES, Start34.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"150.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"154.4 ft. SAP - Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Start154.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4"154.4 ft. SAV - Surface Aggregate Visible, from 07 to 05 o'clock, within 8 inches of joint: YES, Finish184.5 ft. RFJ - Roots Fine Joint, from 07 to 05 o'clock, within 8 inches of joint: YESR, Start214.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"225.1 ft. SAP - Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Finish225.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish225.1 ft. RFJ - Roots Fine Joint, from 07 to 05 o'clock, within 8 inches of joint: YESR, Finish226.2 ft. AMH - Downstream Manhole, Survey Ends - MH 243

Observations (17)

DistanceCodeObservation
225.1SAP
0MWL
3SSS
0MWM
154.4SAP
34.7TFC
225.1SSS
214.5TFC
0AMHMH 0244
225.1RFJ
154.4TF
154.4SAV
226.2AMHMH 243
0MGOCONNECTION IN MH AT 9
3SAV
184.5RFJ
150.8TFC

Properties (7)

additional_info
RFIR
custom_field_three
RFIR
custom_field_two
2
customer
LACSD
datetime
2022-08-26T01:00:00-07:00
documentation
OBREGON, CASTILLO, OLIVER
is_lateral_inspection
false